Project: Barter Island Piling Repair and Stabilization
Client: United States Air Force
Marsh Creek Role: Prime Contractor
Contract: Fixed Price
Project Description: The project consisted of repairing a sheet pile wall that had been installed to reduce shoreline erosion. Following repair of the pilings, gravel was back filled behind the wall for reinforcement.
Marsh Creek will dewater the temporary storage cells under a ADEC general wastewater permit reducing the volume 30 percent and saving the client future handling and disposal costs.
|